Side-by-side comparison of AI visibility scores, market position, and capabilities
Tempe AZ US solar module leader (NASDAQ: FSLR) at $4.2B 2024 revenue (+27%) with 23.5 GW total capacity; $330M South Carolina factory adding 3.7 GW and EPEAT Climate+ certified competing with Qcells for IRA-compliant domestic utility solar.
First Solar, Inc. is a Tempe, Arizona-based solar module manufacturer — publicly traded on NASDAQ (NASDAQ: FSLR) as an S&P 500 component — operating as the largest US solar manufacturer and the only vertically integrated thin-film cadmium telluride (CdTe) solar module company at commercial scale, with 23.5 GW of total nameplate manufacturing capacity across facilities in the United States (Ohio, Alabama, Louisiana), India, Vietnam, and Malaysia as of 2025. In fiscal year 2024, First Solar reported $4.2 billion in net sales (a 27% increase from $3.3 billion in 2023) with a record 14.1 GW of modules sold. In 2025, First Solar committed $330 million to a new South Carolina factory in Gaffney (3.7 GW capacity, ~600 jobs, operations H2 2026) that would bring total US capacity to 17.7 GW. First Solar's CdTe modules have achieved commercial production efficiencies exceeding 20%, and the company holds first-mover status with the EPEAT Climate+ designation for ultra-low carbon solar technology. CEO Mark Widmar leads the company. Founded 1990 in Perrysburg, Ohio.
Houston specialty utility contractor (NYSE: PWR) $23.6B FY2024 revenue (+13%); largest US electric power contractor, data center electrical construction, renewable energy BOP, competing with MYR Group and Primoris.
Quanta Services, Inc. is a Houston, Texas-based specialty contractor — publicly traded on the New York Stock Exchange (NYSE: PWR) as an S&P 500 Industrials component — providing comprehensive infrastructure services for the electric power, gas pipeline, renewable energy, and communications industries through a network of operating units in North America, Latin America, Australia, and internationally through approximately 52,000 employees. In fiscal year 2024, Quanta Services reported revenues of $23.6 billion (+13% year-over-year), with the Electric Power Infrastructure Services segment (power line construction, substation installation, storm restoration, energized work) generating $16.2 billion and the Renewable Energy Infrastructure Services segment (solar and wind farm BOP — balance of plant construction, grid connection, battery storage installation) generating $4.2 billion. CEO Duke Austin has positioned Quanta as the infrastructure services company most directly benefiting from the electrification of the economy: every new electric vehicle charging station requires Quanta-type electrical contractor work (panel upgrades, conduit installation, transformer additions), every new data center requires utility-grade substation construction and high-voltage transmission interconnection, and every utility's grid modernization program requires storm hardening, line replacement, and automation installation — all work that Quanta's operating units execute under multi-year master service agreements with utility customers. Quanta's 2023 acquisition of Cupertino Electric (California-based industrial and data center electrical contractor) and ongoing acquisitions of regional utility contractors expand Quanta's geographic footprint and service capability in the data center electrical construction and renewable energy transmission sectors.
Monitor how your brand performs across ChatGPT, Gemini, Perplexity, Claude, and Grok daily.