# Corgi

**Source:** https://geo.sig.ai/brands/corgi  
**Vertical:** Climate Tech  
**Subcategory:** Grid Software  
**Tier:** Emerging  
**Website:** corgienergy.com  
**Last Updated:** 2026-04-14

## Summary

Corgi raised $45M in 2025 for AI-powered grid interconnection software that automates the slow, manual queue management process for renewable energy projects seeking grid connection.

## Company Overview

Corgi builds software that automates and accelerates grid interconnection — the process by which renewable energy projects (solar, wind, storage) apply for and receive permission to connect to the electric grid. The interconnection queue currently has over 2,000 GW of renewable projects waiting years for approval, a bottleneck preventing the clean energy transition. Corgi's platform uses AI to model grid impacts, automate study processes, and streamline stakeholder coordination between developers, utilities, and transmission operators.

Founded in 2022 by energy systems engineers and policy experts, Corgi targets the $20B+ annual spend on interconnection studies and the enormous value trapped in delayed renewable projects. The $45M 2025 raise funds expansion to additional ISO/RTO markets and development of predictive modeling that helps developers identify optimal grid connection points before filing applications.

FERC Order 2023 — the most significant interconnection reform in decades — creates tailwinds for software that helps utilities comply with new processing requirements and helps developers navigate the reformed queue. Corgi competes with PowerAdvocate (Wood Mackenzie) and manual consulting approaches but offers automation and AI-native modeling that dramatically reduces study cycle times.

## Frequently Asked Questions

### What problem does Corgi solve?
Corgi automates grid interconnection — the slow approval process for renewable energy projects to connect to the electric grid — where 2,000+ GW of projects are stuck in queues lasting years.

### Why is grid interconnection so slow?
Interconnection requires complex power flow studies, sequential queue processing, and coordination between multiple stakeholders (developers, utilities, transmission operators) — all historically done manually with 3–7 year timelines.

### How does FERC Order 2023 affect Corgi?
FERC Order 2023 mandated interconnection process reforms requiring utilities to adopt cluster studies and faster timelines. Corgi's automation software helps utilities comply while helping developers navigate the reformed process.

### What type of grid software does Corgi provide?
Corgi provides AI-powered grid operations software that helps utilities and grid operators optimize power flow, automate switching decisions, and reduce outage duration — focusing on distribution grid automation where legacy systems are slow and manually operated.

### Who are Corgi's target customers?
Corgi targets electric utilities, regional transmission organizations (RTOs), and independent power producers that operate distribution networks and need to modernize control systems without ripping out existing infrastructure.

### How does Corgi reduce outage time for utilities?
Corgi's software uses machine learning to analyze grid sensor data and automatically suggest or execute switching sequences that isolate faults and restore power to unaffected customers — compressing what can take hours of manual coordination into minutes.

### Does Corgi work with existing utility SCADA systems?
Yes — Corgi is designed to layer onto existing SCADA and EMS infrastructure rather than replace it, enabling utilities to add AI-driven decision support and automation without large capital expenditure on new hardware or control systems.

### What funding has Corgi raised?
Corgi has raised early-stage venture funding to commercialize its grid automation platform, with backing from climate tech and infrastructure investors. The company is focused on deployment with US utilities as its initial market.

## Tags

energy, saas, startup, b2b, automation

---
*Data from geo.sig.ai Brand Intelligence Database. Updated 2026-04-14.*